| Meter Upgrade Drawings |
|
|
|
|
| ERECTION OF A WALL COLUMN |
 |
|
NOTE:
When crossing any road the service must be 18 ft high. If on the same side of the road service must be 12 ft high.
All work must be inspected by NEVLEC before connection of the supply
All flush meter pans must be accessible at all times
|
|
|
|
|
|
|
|
|
|
|