{"id":6407,"date":"2026-08-27T20:03:35","date_gmt":"2026-08-27T20:03:35","guid":{"rendered":"https:\/\/www.nevlec.com\/?p=6407"},"modified":"2026-08-28T20:38:44","modified_gmt":"2026-08-28T20:38:44","slug":"nevlec-delegation-advances-geothermal-preparations-during-technical-mission-to-iceland","status":"publish","type":"post","link":"https:\/\/www.nevlec.com\/es\/nevlec-delegation-advances-geothermal-preparations-during-technical-mission-to-iceland\/","title":{"rendered":"NEVLEC Delegation Advances Geothermal Preparations During Technical Mission to Iceland"},"content":{"rendered":"<p>ICELAND \u2014 The NEVLEC delegation currently in Iceland has continued its technical mission in support of the Nevis Geothermal Drilling Project, with a series of engagements focused on the ongoing third-party inspection of the Drillmec HH-300 \u201cT\u00fdr\u201d drilling rig, project coordination, civil works and geothermal capacity building.<\/p>\n<p><img decoding=\"async\" class=\"aligncenter size-full wp-image-6419\" src=\"https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-8.jpg\" alt=\"\" width=\"1500\" height=\"1000\" srcset=\"https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-8.jpg 1500w, https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-8-770x514.jpg 770w, https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-8-18x12.jpg 18w, https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-8-600x400.jpg 600w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>NEVLEC\u2019s General Manager Mr. Nelson Stapleton and Project Coordinator Mr. Naftalie Errar have met with the Scotia Drilling Consultants (SDC) inspection team as the independent inspection of the T\u00fdr rig continues. Discussions have focused on the inspection process, the condition and readiness of the rig and associated equipment, and the requirements to be addressed ahead of mobilization to Nevis.<\/p>\n<p><img decoding=\"async\" class=\"aligncenter size-full wp-image-6425\" src=\"https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-22.jpg\" alt=\"\" width=\"1500\" height=\"1000\" srcset=\"https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-22.jpg 1500w, https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-22-770x514.jpg 770w, https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-22-18x12.jpg 18w, https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-22-600x400.jpg 600w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><\/p>\n<p>The delegation also met with the Iceland Drilling Company (IDC) team and provided an update on the progress of the geothermal project in Nevis, including activities taking place on the ground in preparation for drilling. The discussions allowed both parties to review project readiness, mobilisation requirements, logistics and the coordination necessary as the project moves closer to active drilling.<\/p>\n<p>As part of the mission\u2019s capacity-building component, Stapleton and Errar have also been exposed to geothermal drilling and power-generation operations in Iceland. The delegation visited ON Power\u2019s Hellishei\u00f0i Geothermal Power Plant, which has an installed electrical capacity of approximately 303 MW and is recognized as the largest geothermal power plant in Europe. The visit provided an opportunity to examine the operation of a large-scale geothermal facility and gain insight into geothermal wells, steam-field infrastructure, power generation, reinjection and long-term resource management.<\/p>\n<p><img decoding=\"async\" class=\"aligncenter size-full wp-image-6413\" src=\"https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-9.jpg\" alt=\"\" width=\"1500\" height=\"1000\" srcset=\"https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-9.jpg 1500w, https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-9-770x514.jpg 770w, https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-9-18x12.jpg 18w, https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-9-600x400.jpg 600w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><\/p>\n<p><img decoding=\"async\" class=\"aligncenter size-full wp-image-6414\" src=\"https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-10.jpg\" alt=\"\" width=\"1500\" height=\"1000\" srcset=\"https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-10.jpg 1500w, https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-10-770x514.jpg 770w, https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-10-18x12.jpg 18w, https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-10-600x400.jpg 600w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><\/p>\n<p><img decoding=\"async\" class=\"aligncenter size-full wp-image-6416\" src=\"https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-11.jpg\" alt=\"\" width=\"1500\" height=\"1000\" srcset=\"https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-11.jpg 1500w, https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-11-770x514.jpg 770w, https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-11-18x12.jpg 18w, https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-11-600x400.jpg 600w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><\/p>\n<p><img decoding=\"async\" class=\"aligncenter size-full wp-image-6411\" src=\"https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-12.jpg\" alt=\"\" width=\"1500\" height=\"1000\" srcset=\"https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-12.jpg 1500w, https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-12-770x514.jpg 770w, https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-12-18x12.jpg 18w, https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-12-600x400.jpg 600w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><\/p>\n<p>The NEVLEC representatives also visited an active geothermal drilling site in the Hellishei\u00f0i area, where IDC is undertaking drilling for ON Power to a planned depth of approximately 2,400 metres. This provided the delegation with first-hand exposure to an operational geothermal drilling environment and the interaction between the drilling contractor, power-plant operator and supporting technical teams.<\/p>\n<p><img decoding=\"async\" class=\"aligncenter size-full wp-image-6423\" src=\"https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-20.jpg\" alt=\"\" width=\"1500\" height=\"1000\" srcset=\"https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-20.jpg 1500w, https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-20-770x514.jpg 770w, https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-20-18x12.jpg 18w, https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-20-600x400.jpg 600w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><\/p>\n<p>The delegation also held technical discussions with COWI, an international engineering firm with extensive experience in geothermal and civil infrastructure. The discussions focused on the civil engineering requirements for the Nevis geothermal project, particularly the design and preparation of the well pads and associated infrastructure required to support the drilling programme.<\/p>\n<p><img decoding=\"async\" class=\"aligncenter size-full wp-image-6424\" src=\"https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-21.jpg\" alt=\"\" width=\"1500\" height=\"1000\" srcset=\"https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-21.jpg 1500w, https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-21-770x514.jpg 770w, https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-21-18x12.jpg 18w, https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-21-600x400.jpg 600w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><\/p>\n<p>A further capacity-building engagement was held with the GR\u00d3 Geothermal Training Programme (GR\u00d3 GTP), where discussions focused on opportunities to strengthen geothermal knowledge and technical capacity in Nevis. Among the initiatives discussed was the development of a free two-day \u201cGeothermal 101\u201d introductory course for NEVLEC staff, government officials and other relevant stakeholders. The delegation also discussed the identification and nomination of a suitable candidate to participate in the six-month GR\u00d3 GTP fellowship programme in Iceland, providing an opportunity for more specialized training and long-term institutional capacity development.<\/p>\n<p><img decoding=\"async\" class=\"aligncenter size-full wp-image-6409\" src=\"https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-17.jpg\" alt=\"\" width=\"1500\" height=\"1000\" srcset=\"https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-17.jpg 1500w, https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-17-770x514.jpg 770w, https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-17-18x12.jpg 18w, https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-17-600x400.jpg 600w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><\/p>\n<p><img decoding=\"async\" class=\"aligncenter size-full wp-image-6410\" src=\"https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-18.jpg\" alt=\"\" width=\"1500\" height=\"1000\" srcset=\"https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-18.jpg 1500w, https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-18-770x514.jpg 770w, https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-18-18x12.jpg 18w, https:\/\/www.nevlec.com\/wp-content\/uploads\/2026\/08\/NevisGeothermalDrillingProject-18-600x400.jpg 600w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><\/p>\n<p>The technical mission will continue as the third-party rig inspection progresses, alongside further engagements with civil engineering specialists, Iceland\u2019s national power-sector institutions, geothermal and geoscience experts, and reservoir engineering specialists. These meetings will provide additional insight into civil infrastructure, geothermal resource assessment, reservoir management and the longer-term development and operation of the Nevis geothermal resource.<\/p>","protected":false},"excerpt":{"rendered":"<p>ICELAND \u2014 The NEVLEC delegation currently in Iceland has continued its technical mission in support of the Nevis Geothermal Drilling Project, with a series of engagements focused on the ongoing third-party inspection of the Drillmec HH-300 \u201cT\u00fdr\u201d drilling rig, project coordination, civil works and geothermal capacity building. &nbsp; NEVLEC\u2019s General Manager Mr. Nelson Stapleton and Project Coordinator Mr. Naftalie Errar have met with the Scotia Drilling Consultants (SDC) inspection team as the independent inspection of the T\u00fdr rig continues. Discussions have focused on the inspection process, the condition and readiness of the rig and associated equipment, and the requirements to be addressed ahead of mobilization to Nevis. The delegation also met with the Iceland Drilling Company (IDC) team and provided an update on the progress of the geothermal project in Nevis, including activities taking place on the ground in preparation for drilling. The discussions allowed both parties to review project readiness, mobilisation requirements, logistics and the coordination necessary as the project moves closer to active drilling. As part of the mission\u2019s capacity-building component, Stapleton and Errar have also been exposed to geothermal drilling and power-generation operations in Iceland. The delegation visited ON Power\u2019s Hellishei\u00f0i Geothermal Power Plant, which has an installed electrical capacity of approximately 303 MW and is recognized as the largest geothermal power plant in Europe. The visit provided an opportunity to examine the operation of a large-scale geothermal facility and gain insight into geothermal wells, steam-field infrastructure, power generation, reinjection and long-term resource management. The NEVLEC representatives also visited an active geothermal drilling site in the Hellishei\u00f0i area, where IDC is undertaking drilling for ON Power to a planned depth of approximately 2,400 metres. This provided the delegation with first-hand exposure to an operational geothermal drilling environment and the interaction between the drilling contractor, power-plant operator and supporting technical teams. The delegation also held technical discussions with COWI, an international engineering firm with extensive experience in geothermal and civil infrastructure. The discussions focused on the civil engineering requirements for the Nevis geothermal project, particularly the design and preparation of the well pads and associated infrastructure required to support the drilling programme. A further capacity-building engagement was held with the GR\u00d3 Geothermal Training Programme (GR\u00d3 GTP), where discussions focused on opportunities to strengthen geothermal knowledge and technical capacity in Nevis. Among the initiatives discussed was the development of a free two-day \u201cGeothermal 101\u201d introductory course for NEVLEC staff, government officials and other relevant stakeholders. The delegation also discussed the identification and nomination of a suitable candidate to participate in the six-month GR\u00d3 GTP fellowship programme in Iceland, providing an opportunity for more specialized training and long-term institutional capacity development. The technical mission will continue as the third-party rig inspection progresses, alongside further engagements with civil engineering specialists, Iceland\u2019s national power-sector institutions, geothermal and geoscience experts, and reservoir engineering specialists. These meetings will provide additional insight into civil infrastructure, geothermal resource assessment, reservoir management and the longer-term development and operation of the Nevis geothermal resource.<\/p>","protected":false},"author":1,"featured_media":6422,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[91],"tags":[],"class_list":["post-6407","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","cms-has-post-thumbnail"],"_links":{"self":[{"href":"https:\/\/www.nevlec.com\/es\/wp-json\/wp\/v2\/posts\/6407","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nevlec.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nevlec.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nevlec.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nevlec.com\/es\/wp-json\/wp\/v2\/comments?post=6407"}],"version-history":[{"count":2,"href":"https:\/\/www.nevlec.com\/es\/wp-json\/wp\/v2\/posts\/6407\/revisions"}],"predecessor-version":[{"id":6426,"href":"https:\/\/www.nevlec.com\/es\/wp-json\/wp\/v2\/posts\/6407\/revisions\/6426"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.nevlec.com\/es\/wp-json\/wp\/v2\/media\/6422"}],"wp:attachment":[{"href":"https:\/\/www.nevlec.com\/es\/wp-json\/wp\/v2\/media?parent=6407"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nevlec.com\/es\/wp-json\/wp\/v2\/categories?post=6407"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nevlec.com\/es\/wp-json\/wp\/v2\/tags?post=6407"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}